I took everything out and cleaned, re applied polyurethane and painted the boxes. I then brought the kitchen cabinets in with the appliances to get ready for working on the electrical and plumbing.
I have less than a month left and working on the van when I can! Not much running nor playing pool as I have just under a month left! This week I’m hoping to get the solar power running tomorrow once my missing part comes in. Then I’ll be tackling the bench seats and upper cabinets. After that it’s setting up the shower/plumbing. Finally it will be the walls, flooring and fine-tuning things.


